Smart Maintenance Task Manager

USAGE-BASED MAINTENANCE

Usage-Based Maintenance Software: Service by What the Machine Has Actually Done

Tie maintenance to running hours, distance, cycles or tonnage instead of the date. Technicians read the counters on a planned round, planners see the projected next service, and the task comes due the moment a reading reaches the interval.

EXAMPLE MAINTENANCE RULE

Compressor Room › Air Line 2 › Screw Compressor #4

Oil and Filter Service

Meter
Running hours
Interval
Every 250 hours
At the latest
After 90 days
Read on
Weekly reading round
Next service
Projected from real usage

An example of what one rule carries. The names are illustrative.

THE PROBLEM

The Calendar Cannot See How Hard a Machine Worked

A monthly service on a compressor that ran 400 hours this month is late. The same monthly service on the one that ran 150 hours is early. One machine wears faster than planned while the other uses up oil, filters and technician time it did not need.

Usage-based maintenance fixes the schedule by asking a different question: not how long it has been, but how much the machine has done. It only works if somebody reads the counters, so Smart Maintenance Task Manager treats reading a counter as planned work, like any other task.

HOW IT WORKS

From the Counter on the Machine to the Task on the Phone

Add a meter to the machine

A machine can carry one or more meters: running hours, distance, cycles, or a custom unit of your own.

Tie the rule to the meter

Set the interval, such as service every 250 running hours, and add a calendar limit if you want one: at the latest after 90 days, whichever comes first.

Read the counters on a round

A planner schedules a reading task that walks the technician from counter to counter. Readings work offline and sync like everything else.

The task comes due

The service sits on the calendar at its projected date, and is pulled to today the moment a reading reaches the interval.

READING ROUNDS

Counters Get Read on a Planned Round

A projection is only as good as its newest reading, so readings do not depend on someone remembering to take them.

One Job for a Whole Line

One reading task can cover up to sixty counters, in the order a technician walks them. Schedule it daily, weekly, twice a week or monthly, like any other task. Several rounds a day are available on request.

Readings During Other Work

A technician doing another task at a metered machine can add the reading while standing there. If that machine has a reading task due that day for its one counter, the reading closes it, so nobody is sent back to a display that was read this morning.

No Blank Answers

A round stays open until every counter has an answer: a value, a note that the machine was idle, or a reason the display could not be read. A missed round goes into a daily digest to the people who can act on it.

PLANNING

See the Next Service Before the Reading Gets There

Projected Next-Due Date

Once a machine has a few readings, planners see a projected date for every rule, worked out from how fast the meter is really moving. The reading is the truth, and the date is the estimate.

A Limit for Idle Machines

Combine both measures: every 250 running hours, or at the latest after 90 days, whichever comes first. A machine that stands idle still gets serviced.

Old Readings Get Noticed

A counter nobody has read past its tolerance is named in a digest to the people who plan and assign the work, with the latest reason a technician gave. A projection built on an old number is caught early.

Calendar schedules stay available for everything that wears by time. More on maintenance scheduling →

MOBILE FLEETS AND FIXED PLANT

Every Unit Has Its Own Numbers

A fleet-wide average hides the unit that is about to fail. Set up a mining fleet truck by truck, with haul trucks, excavators, loaders and drills each carrying their own hour, kilometre and tonnage meters, and each with its own service rules. The same approach works for a line of compressors, presses or looms.

More on maintenance for mining fleets →

Frequently Asked Questions

Maintenance scheduled by how much a machine has actually done, such as running hours, distance, cycles or tonnage, rather than by the date. It is sometimes called meter-based maintenance.

A machine can carry one or more meters: running hours, distance, cycles, or a custom unit of your own, such as tonnage.

Yes. A rule can say every 250 running hours or at the latest after 90 days, whichever comes first, so a machine that stands idle still gets serviced.

Technicians record them on the phone, on a scheduled reading round or during any other task at the machine. Readings work without a network and sync when the phone is back online.

The technician records that the machine was idle, or gives a reason the display could not be read. A round cannot be closed with a blank answer, and a counter that goes unread past its tolerance is reported to the people who plan the work.

Yes. It is included in every subscription, and your Admin switches it on for your company. Counters on machines and reading rounds work either way.

See Usage-Based Maintenance in a Live Demo

Our team will walk you through the platform — web and mobile — tailored to your industry and maintenance workflows.